Who can apply
SDE++ is for companies and non-profit organisations. Only the intended producer applies. That is the company that puts the installation into operation and operates it. When an adviser applies on your behalf, the adviser uses a mandate.
A Dutch BV of a group from abroad can apply when that BV will operate the installation in the Netherlands.
- Renewable electricity. Such as solar and wind. Solar panels count from 15 kilowatt-peak (kWp), on a grid connection larger than 3 x 80 amperes.
- Renewable heat and gas. Such as geothermal energy and digestion.
- Low-CO2 heat. Such as a heat pump from 500 kilowatts of heat or an electric boiler from 2 megawatts of heat.
- Low-CO2 production. Such as hydrogen from an electrolyser from 500 kilowatts, and carbon capture and storage.
What you receive
Each category has a base amount. This is the cost price of production, and the highest amount you can apply for. Each year the government sets a correction amount, the average revenue from what you produce. Your subsidy per unit is the difference between the two.
The correction amount is at least two thirds of the long-term price. You receive the subsidy for 12 or 15 years. The decision states the maximum amount over the full term.
| Phase in 2026 | Subsidy per tonne of CO2 up to | Dates |
|---|---|---|
| 1 | €75 | 27 October 9:00 to 2 November 17:00 |
| 2 | €150 | Until 9 November 17:00 |
| 3 | €225 | Until 16 November 17:00 |
| 4 | €300 | Until 23 November 17:00 |
| 5 | €400 | Until 26 November 17:00 |
RVO handles applications in order of arrival. When the budget is used up on a day, RVO ranks the projects of that day on the subsidy per tonne. Low-temperature heat, high-temperature heat and molecules each have a reserve of €750 million. All times are Dutch time.
What the subsidy is worth
Say the base amount of your project is €0.08 per kilowatt-hour and the correction amount in a year is €0.05. You then receive €0.03 per kilowatt-hour for that year. At 2 million kilowatt-hours, that is €60,000, and €900,000 over 15 years with the same amounts.
In the 2025 round, 360 projects received a little over €7.1 billion in total, almost €20 million per project on average.
What the application needs
- Permits. The permit is in place at the time of application, and you send a copy. Solar and wind need a full environmental permit.
- Feasibility study. With an operating calculation and a financing plan. When equity is below 20%, a statement from the lender is part of it.
- Grid capacity. A solar project needs a transport indication from the grid operator for this round.
- Consent. The owner of the site signs the consent form of RVO.
- Order of steps. You make firm commitments for the investment after the application.
How we arrange the application
Our team arranges the full application. A specialist from our network prepares the feasibility study with your engineers. You decide at every step, and RVO decides on the subsidy.
| Work | Who does it |
|---|---|
| The choice of the category, the bid and the phase | The specialist from our network and our team |
| The feasibility study with the operating calculation and the financing plan | The specialist, with your figures |
| The check of the permits, the transport indication and the consent of the site owner | Our team |
| The Dutch company of a group from abroad, with its registrations and eHerkenning, the Dutch business login | Our team |
| The submission in the right phase | Our team with a mandate, or your director with eHerkenning at level 3 |
| After the grant, the production reports and the yearly settlement | Our team, with your production figures |
Our fee consists of a feasibility check at a fixed price, a fixed amount for the application file and a percentage of the subsidy paid out to you, all agreed in advance. You see each amount in your proposal before you decide.
- Our team has a look first. You describe the installation, the site, the permits and the timetable.
- Feasibility check. We test the category, the bid per tonne and the documents.
- Proposal. You receive the scope of the work and the fee before you decide.
- Application. We prepare the study and submit a complete application in the phase that suits your bid.
- After the grant. We prepare the reports and the settlement, year after year.
When to apply
- The 2026 round. From 27 October 2026 at 9:00 until Thursday 26 November 2026 at 17:00 Dutch time.
- A complete application. RVO places only complete applications in the order.
- 2027 and later. According to RVO, the Dutch government reserves €8 billion a year for 2027 to 2032. The dates of the 2027 round follow.
Payments and obligations after the grant
- Construction. The deadline for operation differs per category. For onshore wind, it is 4 years after the decision.
- Advance. Each month you receive an advance of 80% of the expected amount for that year.
- Settlement. RVO sets the subsidy each year on your actual production and the correction amount of that year.
Our overview also explains the EU Innovation Fund, the hydrogen auctions and the Dutch tax credit for research and development. See subsidies for energy and industry projects in the Netherlands.
Other schemes our team arranges
- Energy and industry subsidies in the Netherlands. The overview, with the EU Innovation Fund, the European Hydrogen Bank, SDE++ and WBSO.
- Industrial climate projects (NIKI). At least €30 million to scale up a proven technology in industry.
- Climate investments in industry (VEKI). Up to €30 million for proven technology that cuts CO2.
- Research for the energy transition (MOOI). Up to €4 million for research by at least three companies.
- Innovation Credit. A government credit for technical and clinical development.
- EU Innovation Fund. Up to 60% of the relevant costs of large clean-industry projects.
- Hydrogen and methanol ships. Up to €4 million per ship for a hydrogen or methanol energy line.
- Hydrogen in mobility (SWIM). For hydrogen refuelling stations together with transport companies.
For companies in the Netherlands, the overview in Dutch is subsidie aanvragen voor je bedrijf.
Sources
- Netherlands Enterprise Agency (RVO), applying for SDE++ (read on 1 November 2026, in Dutch)
- RVO, how SDE++ works (in Dutch)
- RVO, more time for the SDE++ application in 2026 (in Dutch)
- RVO, SDE++ for renewable electricity (in Dutch)
- RVO, feasibility study handbook SDE++ 2026 (in Dutch)
- RVO, final results of SDE++ 2025 (in Dutch)
- Staatscourant 2026, 25954, the SDE++ regulation for 2026 (in Dutch)
Last reviewed on 1 November 2026.
Your company in the Netherlands
One package for the full setup. You sign a power of attorney in your own country. The notary in the Netherlands does the rest. You receive a proposal with the price for your situation before you decide.
Swipe to see all four options →
Your Dutch BV
- The notary deed, signed for you with a power of attorney
- Registration at the Dutch Chamber of Commerce (KVK)
- The identity check the law requires
- Registration of the owners in the register of ultimate owners (UBO register)
- Your tax number and VAT number
- The list of documents from your country, and how to legalise them (apostille)
- Advice on the setup for low tax from the start: one company or a holding, your first financial year and your salary
- Personal support during the setup and the start of your company
Holding and operating company
Set up for growth of your company and your wealth.
- Two companies, set up together, with everything from the BV package for both
- You can pay profit to your holding tax-free (participation exemption)
- In your holding, you keep your profit apart from the risks of daily business, and you can invest it
- If you sell your operating company later, your holding receives the profit tax-free
What you can add
Made for your company. The price is in your proposal.
- Business bank account: the complete file your bank asks for
- eHerkenning: your login for the Dutch tax portal
- EORI number: your number for import and export
- Article 23 licence: you settle import VAT in your VAT return, so you keep that cash in your company
- One VAT return for all your online sales in the EU (One Stop Shop, OSS)
- Payroll tax number, so your company can pay you a salary
- A lower director salary, prepared and submitted to the tax authority
- The 30% ruling for you or your staff, when you relocate to the Netherlands
- Bookkeeping, VAT returns and annual accounts
- Licences and EU rules for your sector
Your first-year plan
Before you start trading, our team looks at everything you plan to do, prepares a plan for your first year and files the applications for you. See the first-year plan →
- The registrations and licences your company needs
- Your salary, dividend and loans from your company in year one
- The tax schemes and deductions you are entitled to
- Your numbers for the first year: tax, salary and what you keep in your company